top of page
  • Writer's pictureTreisTek

Case Study - Apartment Complex

Updated: Jul 8, 2021

In this project, we have worked on 10 different apartment units by developing a Revit floor plan for each apartment and commercial space, Roof plan, Exterior 3D BIM with Architectural and Structural Detailing. We have also coordinated with the client’s BIM management team and created parametric families.

Location: United States

Project Duration: 7 days

Category: Apartment Complex

Scope of Work: Revit floor plan for each apartment and commercial space, Roof plan, Exterior 3D BIM with Architectural and Structural Detailing.

As-Built Model: LOD 300

Input: 2D drawings

Output: 3D Model

TreisTek’s Solutions:

  • Roof Modeling, Floor Plan

  • BIM Coordination (Architectural, Structural)

  • Model coordination

  • Project Coordination and Standardization

  • Closely working with the client to achieve better results

  • Clash Detection

  • Regular QA and QC

Results:

  • Developed interior and exterior 3D models with architectural and structural detailing.

  • Guaranteed on-time delivery by dedicating separate teams and resources.

  • Avoid discrepancies in the modeling process by developing a smooth workflow and level of details.

  • Provide progress reports as per the requirement to ensure the accurate delivery of models in line with the clients’ requirements.

  • Providing separate resources and tools for quality checks.

244 views0 comments

Recent Posts

See All
bottom of page