Simulation
Simulation is a process that joins a 3D models with the project schedule allowing all stakeholders to visualize the various phases in a virtual environment. Simulation also, allows improving sequencing by simulating the placement of resources – effectively mapping the model and the delivery time-line together.
Our 4D BIM Construction can be used for the following:
-
PRE-BID presentation
-
Time line services
-
BIM construction phasing
-
Construction sequence planning
-
Revit BIM planning services
-
Simulation
-
Construction video animation
-
Construction planning and scheduling
Our solutions derived with help of advanced scheduling techniques in real time coordination with 3D models, empower clients with maximum planning and increase their vision towards potential construction and operational challenges.

Benefits of 4D construction project schedules are:
-
Powerful Visualization of Construction Process
-
Streamlined Construction Productivity
-
Reduced Cost & Error in Construction
-
Efficient Logistics Management

Traffic Simulation:
Traffic simulation or the simulation of transportation system is the mathematical modeling of transportation systems through the application of computer software to help, plan and design transportation systems.
TreisTek uses the traffic simulation tool to analyse traffic flow through intersections, display color-coded traffic analysis results and generate traffic simulation animations to play in city model.
