Case Study - Off-Shore Plant Modelling

Updated: Jul 15, 2021


Project Title : Off-shore Plant Modeling

Software Used : Cyclone

Deliverables : .coe and .dgn formats

Accuracy Level : 5mm

File Unit : Meters

Duration : 42 days

Resources : 10

Year : 2019

Scope of Work :

  • All elements that intervene in the design must be modeled.

  • Model all the fixed objects from the specified scope at standard level of detail down to 1”.

  • Model all pipes/conduits (rigid), pipes secondary supports, equipment, electrical trays, duct and electrical components with 1” OD and above.

  • Instrumentation and Telecom

  • Structural Detailing

  • The entire project was divided into 4 parts.


98 views0 comments